Laserfiche WebLink
February 1999 Yaart Mine * 13-12 Drainage and Sediment Control Plan • 13 <br />• <br />~/ <br />TABLE 13-12.7 <br />Turf Reinforcement Mat Performance Guider <br />Product Manufacturer Manning's Permissible Velocity Permissible Sheer Stress <br /> "n"3 (fps) (lbs/ftz) <br /> Bare Soil Vegetated Bare Soil Vegetated <br />P300 North American Green 0.034 9.0 16.0 3.0 8.0 <br />SC250 North American Green 0.040 9.5 15.0 3.0 10.0 <br />C350 North American Green 0.041 10.5 20.0 3.2 12.0 <br />P550 North American Green 0.041 12.5 25.0 4.0 14.0 <br />GFP-12 Greenfix America 0.024 12.0 4.5 <br />CPG Greenfix America 0.024 Z0.0 10.0 <br />3000 <br />Enkamat Colbond Geosynthetics 0.030 20.0 19.0 6.7 8.0 <br />7010 <br />Enkamat Colbond Geosynthedcs 0.030 20.0 19.0 11.2 9.0 <br />7018 <br />Enkamat Colbond Geosynthetics 0.030 13.0 19.0 11.2 10.0 <br />7020 <br />Notes: 1) This is a select list of products, SCC may use another equivalent product if the performance <br />criteria meets the minimum standards. <br />2) The manufacturer's product-specific performance properties are documented in Attachment <br />7-12-A., TurfReln}orcementMatDesigri aad Installation Information. <br />3) Manning's n values are based on bare soil conditions with flow de th of 0.5 feet. <br />1. Prepare a stable and firm soil surface free of large rocks and other obstructions. Apply <br />appropriate seed mixture. <br />2. Install TRMs after application of seed, mulches (if applicable) and other soil amendments, <br />unless soil in-filling is required. If soil in-filling is needed, install TRM, apply seed and <br />other amendments and brush or rake topsoil into TRM matrix. <br />3. Anchor top of blanket at end of channel section using trench and/ot staples/stakes. <br />4. Unroll center blanket in direct of water flow on bottom of channel. Securely fasten blanket <br />to soil surface with staples/stakes in accordance with manufacturer's staple pattern guide. <br />If available, use colored dot pattern corresponding to the manufacturer's recommended <br />staple pattern. If applicable, overlap adjacent blankets and staple. <br />5. Anchor full-length margin of blankets at top of side slopes with a row of staples/stakes. <br />Backfill soil material over final 12-inches of blanket margin and compact. <br />• <br />Montgomery Watson Mining Group * 165 S. Union Boulevarr~ Suite 460 * Llrketvaot~ Colorado 80228 * (303) 763-5140 <br />TR-30 Revised 05/07 <br />