Laserfiche WebLink
In the past several years the Division has reviewed and/or approved several revisions that <br />influence the hydrologic analysis included in TR-78. TR-63 resulted in drainage designs <br />for permanent ditches in the East Pit. TR-73 changed the approved hydrologic curve <br />numbers for the various reclamation blocks. Two other revisions, TR-79 and TR-80, <br />approved a more detailed schedule for backfilling and grading of areas of the West Pit <br />and the East Pit at Colowyo, respectively. In addition to the materials submitted with <br />TR-78, the Division reviewed the revised materials approved in these other revisions, the <br />2008 reclamation map, the approved drainage profiles (Map 33 and Map 33A), and the <br />approved permanent drainage map, Map 41. <br />The revised SEDCAD model proposed in TR-78 for the Prospect pond includes the <br />internal ditches (A, B, and C) to divert a portion of the ungraded spoil runoff to the East <br />Pit, and the temporary sump. The sump is constructed in the spoil area adjacent to the <br />completed section of the Prospect post-mining drainage, to assist in handling and treating <br />runoff from about 57 acres above the sump that includes both reclaimed and un- <br />reclaimed areas. Recently approved hydrologic input parameters (from TR- 73) were <br />used in the proposed SEDCAD model to calculate flows into Prospect Pond with the <br />internal ditches and sump in-place. The Division evaluated how the proposed model <br />correlates with the backfilling and grading plan approved in TR-80. <br />The Division evaluated the backfilling and grading plan (Map 29, revised and PE <br />stamped 3/26/2009) to understand the sequence of reclamation at Colowyo, especially in <br />the East Pit. The Division digitized the acreage for each area and put the acres in the <br />table shown below. Since many of the reclamation blocks have a range of years for a <br />given area rather than one specific year, the Division listed a minimum and a maximum <br />number of acres by pit for each year. Reclamation in the West Pit is to be completed by a <br />given year for each block. Reclamation in the East Pit has a specified number of acres to <br />be graded each year. <br />Year end Overall min Overall max East Pit min East Pit max <br />2007 0 144.5 0 102.5 <br />2008 0 391.5 0 102.5 <br />2009 47 718.0 47 47 <br />2010 36.5 707.5 36.5 36.5 <br />2011 47.4 624.4 47.4 47.4 <br />2012 35.0 612.0 35 35.0 <br />2013 24.5 96 24.5 24.5 <br />2014 0 71.5 0 0 <br />2015 0 99.5 0 28 <br />2016 0 599.5 0 28 <br />2017 0 599.5 28 (if not done) 28 <br />2018 0 949.5 0 0 <br />2019 0 378 0 0 <br />2020 0 378 0 0 <br />2021 0 69 0 0