Laserfiche WebLink
c-??si-??? T?-?? <br />??? Adequacy ev?ew <br />0?-Nov-?0?? <br />Page ? of 3 <br />There is no stream flow discussion provided f ?r? Tuttle ?ra? ire t? current p?rr?it <br />document. This is irnpor?tant information in understanding the rationale for the surface <br />water samplingp?an at Tattle ?ra?v. father than referenced the pertinent i?f oration <br />regarding Bows in Tuttle draw should ?e su?n?nar?ized and incorporated in to the c?crrent <br />perit volr??ne on page ?. ??. 7-3?. <br />Tuttle Draw information from Volume B has been zncluded beginning on page <br />x.04.7-3?. Na further action is required, <br />4. D??: n tie bottom of ae ?. ?4? 7-??, WF s?at?s `?t?e temporary p?peli?e mill ?? <br />removed in the year ???? when the rniningprogress eliminates the need for irrigation <br />water in advance of the mine. " This appears to be outdated and shoa?d be updated <br />accordingly. <br />The text has been updated on pages x.04.7'-40 and -41 accordingly. Na further <br />action is required, <br />5. D?: ?n the lastpar?agraph of page ?F 0?. 7-?5 aI? discharging P??S' ?utalls ('? <br />? ?? are listed for sampling on a quarterly basis according to the parameters listed in <br />Table ?, 04.7-?. 'lease update this information to include all discharging outfalls, for <br />example Fond ? ? is continuo?csly discharging now but is not listed here. <br />The parameter and sample frequency information provided xn tables should match <br />the description given in the text. Please update the description at the bottom of <br />revised page numbers x.04.?-49 to be consistent with Table x.04.7-1 Hydrology <br />N?onitoring Program information. Thy second sentence of the last paragraph <br />should read as follows; "water quality parameters listed in Table ?.a4,7-? will be <br />collected as follows: quarterly basis far all discharging NP?? ?utl`alls; semi- <br />annual basis far stations w'N1, w?3, -N?ll4, -n1a? and -Nla,}' <br />?. DRYS; The Division will require ?? to do semi-annual full suite laboratory analysis <br />and semi-annual field analyses per the parameters listed on Table x.04.7- far all five <br />approved surface water sites. The sampling should be conducted once during the <br />irrigation season and once again in the nun-Irrigation season every year. This will <br />provide some relief from the monthly field monitoring as requested b? , but more <br />importantly will provide a reasonable and consistent approach to the surface monitoring <br />program. Please revise and update the pertinent sections ?. X4.7 in the permit application <br />package including Table ?, 04.7-?. <br />The information far sites on Table x.04.7-1 dues nut yet accurately reflect the <br />requirements far semi-annual full-suite laboratory and semiannual field analyses <br />per the parameters listed in Table ?.a4.7-?. ?n particular, the footnotes have oat <br />been correctly updated. ?'aotnate ?1} should read, "iVieasuresemi-annual February, <br />August', nut ?`Nfeasure annual ?August?", and the last sentence of the footnote