Laserfiche WebLink
7. Revegetation Success Criteria <br />Revegetation will be deemed adequate when erosion is controlled in an adequate manner, and the <br />vegetation is considered satisfactory to the Division. <br />8. Monitoring Reclamation Success <br />Monitoring the reclamation on an ongoing basis will help to assure successful reclamation. The <br />operator plans to use the local NRCS office to assist in determining the ability of the reclaimed <br />land to control erosion and any other suggestions which may enhance the reclamation of the site. <br />If minor changes or modifications are needed to the seeding and reclamation plan, revision plans <br />will be submitted to the Division as required. It is hoped that the Division will provide assistance <br />in evaluating the success of the ongoing reclamation process. All areas disturbed and reclaimed <br />and any other important items regarding the reclamation will be submitted in the annual reports <br />to the Division. <br />Cugnini Pit, November 2009 E-5