<br />amec <br />Earth $ Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: October 17, 2009 <br />Reporting Period: 10/11/09 through 10/17/09 <br />Days S M T W T F S <br />Work Shifts D D D D D D <br /> E <br />D = Day Shift N = Night Shift <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Ambient Temperature Range (F): Low: 32°F to 40°F (+/-) High: 57°F to 60°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No work delays due to weather. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />No work performed during the week. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Topsoil Relocation <br />1) VLF <br />Topsoil was excavated form the north side of the old substation using a John Deere 850 <br />excavator. The material was loaded into CAT 777 haul trucks and transported to the topsoil <br />stockpile located south of the LOB haul road. The stockpile was maintained using a CAT D-8 <br />dozer. All topsoil has been removed from the entire VLF footprint as of the 15th of October <br />2009. <br />D) Subgrade Preparation <br />1) VLF <br />Subgrade preparation was performed between stations J0+00 (+/-) and J4+00 (+/-), <br />approximately 100 to 150 feet right of centerline. A CAT D-10 dozer was used to rip the <br />subgrade surface to a depth of 6" to 8". The subgrade was then moisture conditioned using a <br />VLF Weekly Report WE 10. 1 7.09.D.doc