My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-04_REPORT - M1980244 (5)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-11-04_REPORT - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:22 PM
Creation date
11/5/2009 8:34:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/4/2009
Doc Name
Weekly Construction Quality Assurance ("CQA") Report- 10/11/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />amec <br />Earth $ Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: October 17, 2009 <br />Reporting Period: 10/11/09 through 10/17/09 <br />Days S M T W T F S <br />Work Shifts D D D D D D <br /> E <br />D = Day Shift N = Night Shift <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Ambient Temperature Range (F): Low: 32°F to 40°F (+/-) High: 57°F to 60°F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No work delays due to weather. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />No work performed during the week. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Topsoil Relocation <br />1) VLF <br />Topsoil was excavated form the north side of the old substation using a John Deere 850 <br />excavator. The material was loaded into CAT 777 haul trucks and transported to the topsoil <br />stockpile located south of the LOB haul road. The stockpile was maintained using a CAT D-8 <br />dozer. All topsoil has been removed from the entire VLF footprint as of the 15th of October <br />2009. <br />D) Subgrade Preparation <br />1) VLF <br />Subgrade preparation was performed between stations J0+00 (+/-) and J4+00 (+/-), <br />approximately 100 to 150 feet right of centerline. A CAT D-10 dozer was used to rip the <br />subgrade surface to a depth of 6" to 8". The subgrade was then moisture conditioned using a <br />VLF Weekly Report WE 10. 1 7.09.D.doc
The URL can be used to link to this page
Your browser does not support the video tag.