My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-03_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-11-03_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:44 PM
Creation date
11/4/2009 1:12:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
11/3/2009
Doc Name
Revised 2009 Midterm Cost Estimate (Memo)
From
Jim Stark
To
Joe Dudash
Type & Sequence
MT3
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : 03-Nov-09 Permit C-1996-083 Site: Bowie No. 2 M ine <br />User: JRS State : Colorado <br /> Filename: C083-00e County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: 2009 Midterm Review <br /> Road Reclamation Tasks - Tasks 070-086 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />070 Rip Haul Roads (Portion Being Reclaimed) and Old Truck Loadout 116.48 $123,351 <br />071 Remove Haul Road Subbase and Place on Gob Pile #1 33.65 $14,525 <br />072 Rip Truck Loadout Road 2.15 $2,273 <br />073 Haul Truck Loadout Subbase to Gob Pile #1 14.08 $6,080 <br />074 Rip Upper Haul Road Asphalt Prior to Narrowing Road 2.95 $3,125 <br />075 Pull Back and Haul Fill Material from Upper Haul Road Narrowing to Cut Slopes 142.76 $76,591 <br />076 Regrade Narrowed Section of Haul Road 26.10 $26,785 <br />077 Rip Gob Pile #1 Road 2.36 $2,499 <br />078 Regrade Gob Pile #1 Road 5.17 $5,303 <br />079 Rip Access Road 0.74 $780 <br />080 Haul Access Road Surface to Gob Pile #1 5.37 $2,316 <br />081 Regrade Access Road 1.79 $1,842 <br />082 Rip Freeman Gulch Vent Shaft Light-Use Road 0.19 $199 <br />083 Backfill and Grade Haul Road to Gob Pile #2 0.44 $449 <br />084 Rip Lower Haul Road 0.66 $688 <br />085 Regrade Lower Haul Road 36.44 $37,399 <br />086 Regrade Light-Use Roads from MR's and TR's 74.00 $75,956 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Total Direct Cost 465.33 $380,161 <br />jrs 03-11-09
The URL can be used to link to this page
Your browser does not support the video tag.