Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 061 <br />Date : 1110212009 <br />User : JRS <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />State : Colorado Permit/job # : C-96-083 <br />County :Delta Abbreviation :none <br />Site :Bowie No. 2 Mine Filename :C083-061 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : 2009 Midterm Review <br />Task description :Rip D-Portal Bench <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br />Utilizatio n % <br />Cost Breakdown : Ownership cost/hour : $86.56 NA <br />Dozer operating cost/hour : $126.50 100 <br />Ripper operating cost/hour : $8.09 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $259.69 Total fleet cost/hour : $1,038.77 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA <br />Area : 9.00 <br />NA <br />acres <br />Load factor : NA Bank volume <br />Rip depth (ft) : 2.63 Volume <br />NA BCY <br />3R_ 188 BCY or CCY <br />Source of estimated quantity :Map 15-2 <br />Source of estimated lo ad factor :NA :T <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity: NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 3,390.93 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.88 feet/pass Site altitude : 6,800 feet <br />Average ripping width : 8.67 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 50.00 feet/pass Job efficiency factor : 0.83 (1 shif 1day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br /> <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.730 acres/hour Adjusted unit production : 2,814.47 cu. yds./hour <br />Unadjusted production : 3,390.93 cu. yds./hour Adjusted fleet production : 11,257.90 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 4 dozer(s) Total job time : 3.39 hours <br />Unit cost : $0.092 per cu. yd. Total job cost : $3,524