Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 046 State : Colorado Per nit/job # : C-1996-083 <br />Date : 1110212009 County :Delta Abbreviation :none <br />User : JRS Site : Bowie No. 2 Mine Filename : C083-046 <br />Permit or other job action :2009 Midterm Review <br />Task description :Place 1.6 Feet of Cover on Gob Pile #3 <br />HOURLY EQUIPMENT COST <br />Cost Bn <br />Shift basis <br />r)acrrintinn <br />sheet 1 of 2 <br />1 per day <br />Scraper work team -Scraper: Cat 627G w/push-pull <br />-Push dozer: NA <br />Support equipment -Load area :INA <br />-Dump area :ANA <br />Koao maintenance -Motor grader: INA <br />-Water truck :INA <br />Pakdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename. scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment. NA NA NA NA NA NA <br />Ownerhip cost/hour. $68.97 NA NA NA NA NA <br />Operating cost/hour : $121.90 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.98 NA NA NA NA NA <br />Unit subtotals : $215.86 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $431.71 Support: $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $431.71 <br />MATERIAL QUANTITIES - - <br />Initial Swell Loose <br />volume : 38,700 BCY factor : 1.250 volume : 48,375 LCY <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor : CAT Handbook