Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task 045 State : Colorado Permit/job #: C-1996-083 <br />Date : 1110212009 County :Delta Abbreviation :none <br />User : JRS Site: Bowie No. 2 Mine Filename :C083-045 <br />Permit or other job action :2009 Midterm Review <br />Task description :Replace Subsoil from Stockpile to Gob Pile #2 <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />1Equipment Description <br />Cost Bn <br />Scraper work team -Scraper : Cat 627G w/push-pull <br />-Push dozer :INA <br />Support equipment -Load area :INA <br />-Dump area :INA <br />Road maintenance -Motor grader : NA <br />-Water truck :NA <br />:akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $68.97 NA NA NA NA NA <br />Operating cost/hour : $121.90 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.98 NA NA NA NA NA <br />Unit subtotals : $215.86 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $431.71 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $431.71 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 41,600 CCY factor : 1.165 volume : 48,464 LCY <br />Source of quantity take-off :Appendix A <br />Source of estimated swell factor : CAT Handbook