Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 042 State : Colorado Permit/job #: C-96-083 <br />Date : 1110212009 County : Delta Abbreviation :none <br />User : JRS Site : Bowie No. 2 Mine Filename : C083-042 <br />Permit or other job action :2009 Midterm Review <br />Task description :Haul Top One Foot from Stocknilp Arpa to rnh Pilo ifs <br />HOURLY EQUIPMENT COST <br />Shift basis <br />Description <br />Cost Bn <br />1 per day <br />Scraper work team -Scraper : Cat 627G w/push-pull <br />-Push dozer :INA <br />Support equipment -Load area : NA <br />-Dump area J NA <br />Road maintenance -Motor grader: ?NA <br />-Water truck :I NA <br />iakdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $68.97 NA NA NA NA NA <br />Operating cost/hour : $121.90 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.98 NA NA NA NA NA <br />Unit subtotals : $215.86 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $431.71 Support: $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $431.71 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 6,453 LCY factor : NA volume : 6,453 LCY <br />Source of quantity take-off :Division Estimate <br />Source of estimated swell factor : NA