Laserfiche WebLink
CIRCES Cost Estimating Software <br />COMPACTION WORK <br />PROJECT IDENTIFICATION <br />Task # . 039 State : Colorado Permit/job #: C-96-083 <br />Date : 02-Nov-2009 County :Delta Abbreviation :none <br />User: JRS Site :Bowie No. 2 Mine Filename :C083-039 <br />Agency or organization name : Colorado Division Of Reclamation, Mir <br />Permit or other job action :2009 Midterm Review <br />Task description : Compact Refuse on Gob Pile #2 <br />HOURLY EQUIPMENT COST <br />Machine description :CAT 815F <br />Cost Breakdown : <br />MATERIAL QUANTITIES <br />Loose <br />volume : 200.000 <br />And Safety <br />LC <br />Horsepower: 240 <br />Compactor type : Soil -tamping foot Shift basis : 1 per day <br /> Utilization % Data source : (CRG) <br />Ownership cost/hour : $44.16 NA <br />Operating cost/hour : $78.47 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $161.17 Total fleet cost/hour : $161.17 <br /> <br />Shrinkage Compacted <br />factor : 0.900 volume : 180,000 Y <br />CCY <br />Source of estimated volume : Page 2.05-45 <br />Source of estimated shrinkage factor : CAT Handbook <br />HOURLY PRODUCTION <br />Unadjusted hourly production = (W x S x L x C) / P <br />Compacted width per pass (W) : 6.42 feet <br />Average compactor speed (S) : 4.00 mph <br />Compacted thickness of each lift (L) : 12.00 inches <br />Conversion constant (C) : 16.3 (5,280 ft./12 in./27 cu.ft.) <br />Required number of machine passes (P) : 3 passes <br />Unadjusted hourly unit production : 1,674.34 CCY/hr <br />Job Condition Correction Factors Source <br />Site altitude : 6,100 feet Altitude adjustment factor : 1.00 (Cat HB) <br /> Job efficiency factor : 0.83 (1 shift/day) <br /> Net job correction : 0.83 multiplier <br /> Adjusted hourly unit production : 1,389.70 CCY/hr <br /> Adjusted hourly fleet production : 1,389.70 CCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time : 129.52 hours <br />Unit cost $0.116 per CCY Total job cost : $20,875