My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-03_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-11-03_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:44 PM
Creation date
11/4/2009 1:12:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
11/3/2009
Doc Name
Revised 2009 Midterm Cost Estimate (Memo)
From
Jim Stark
To
Joe Dudash
Type & Sequence
MT3
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: Colorado Division Of Reclamation, Mining And Safety <br />Task 027 State :Colorado Permit/job # : C-1996-083 <br />Date : 1110212009 County :Delta Abbreviation :none <br />User: JRS Site :Bowie No. 2 Mine Filename : C083-027 <br />Permit or other job action :2009 Midterm Review <br />Task description : Haul Rock to Vent Shafts for Disposal <br />HOURLY EQUIPMENT COST Shift basis <br />(Equipment Description <br />Truck/loader team -Truck :(Generic 10-12 cy, 6x4 <br />-Loader : CAT 950G (2002) <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA NA <br />% Utilization-machine : 99 100 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $13.34 $22.80 NA NA NA NA <br />Operating cost/hour : $38.51 $27.63 NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $22.29 $38.54 NA NA NA NA <br />Unit subtotals : $74.14 $88.96 NA NA NA NA <br />Number of units : 4 1 0 0 0 0 <br />Group subtotals : Work : $385.52 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $385.52 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,000 LCY factor : NA volume : 2,000 LCY <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor :NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />_._. ------ <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis : <br />Material weight : 2,950 pounds/LCY Struck volume : <br />Descr.: Traprock - broken Heaped volume : <br />Rated payload : 35,400 pounds Average volume : <br />Payload capacity : 12.00 LCY Adjusted volume': <br /> Final truck volume based on number of loader passes <br /> truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : <br />Rated capacity (nom. heaped) : 3.750 LCY Truck <br />Descr.: USER-PROVIDED BUCKET FILL FACTOR Altitude adj.: 1.000 <br />Bucket fill factor : 0.500 Job efficiency : 0.830 <br />Adjusted bucket capacity : 1.875 LCY Net correction : 0.830 <br />10.00 LCY <br />12.00 LCY <br />11.00 LCY <br />12.00 LCY <br />11.25 LCY <br />Site altitude (ft.) : 7,100 <br />Loader Source <br />1.000 (Cat HB) <br />0.830 (1 shift/day) <br />0.830
The URL can be used to link to this page
Your browser does not support the video tag.