My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-03_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-11-03_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:44 PM
Creation date
11/4/2009 1:12:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
11/3/2009
Doc Name
Revised 2009 Midterm Cost Estimate (Memo)
From
Jim Stark
To
Joe Dudash
Type & Sequence
MT3
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Agency or organ <br />Task #: 014 <br />Date : 1110212009 <br />User : JRS <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />ization name : Colorado Division Of Reclamation, Mining And Safety <br />State : Colorado Permit/job # : C-96-083 <br />_ County :Delta Abbreviation :none <br />Site :Bowie No. 2 Mine Filename :C083-014 <br />Permit or other job action :2009 Midterm Review <br />sheet 1 of 2 <br />Task description : Haul Fill from Adjacent Material Storage Area to B-Seam Portal Bench <br />HOURLY EQUIPMENT COST Shiftbasis : 1 per day <br />Equipment Description <br />Truck/loader team -Truck : Cat 773D (2002) <br />-Loader : CAT 988G (2005) <br />Support equipment -Load area : NA <br />-Dump area :NA <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA NA <br />% Utilization-machine : 87 100 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $63.47 $62.60 NA NA NA NA <br />Operating cost/hour : $75.76 $76.38 NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $22.29 $38.72 NA NA NA NA <br />Unit subtotals : $161.52 $177.70 NA NA NA NA <br />Number of units : 2 1 0 0 0 0 <br />Group subtotals : Work : $500.74 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $500.74 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 53,000 CCY factor : 1.165 volume : 61,745 LCY <br />Source of quantity take-off : Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,900 pounds/LCY Struck volume <br />Descr.:Decomposed rock - 50% rock, 50% earth Heaped volume <br />Rated payload : 108,060 pounds Average volume <br />Payload capacity : 37.26 LCY Adjusted volume* <br />Final truck volume based on number of loader passes <br />truck volume adjusted to not exceed rated payload or heaped volume <br />33.80 LCY <br />45.90 LCY <br />39.85 LCY <br />37.26 LCY <br />35.87 LCY <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 6,900 <br />Rated capacity (nom. heaped) : 8.200 LCY Truck Loader Source <br />Descr.:Loose material - 1"and over (85 - 90%) Altitude adj.: 1.000 1.000 (Cat HB) <br />Bucket fill factor : 0.875 Job efficiency : 0.830 0.830 (1 shift/day) <br />Adjusted bucket capacity : 7.175 LCY Net correction : 0.830 0.830
The URL can be used to link to this page
Your browser does not support the video tag.