My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-03_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-11-03_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:44 PM
Creation date
11/4/2009 1:12:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
11/3/2009
Doc Name
Revised 2009 Midterm Cost Estimate (Memo)
From
Jim Stark
To
Joe Dudash
Type & Sequence
MT3
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinq Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task #: 010 State : Colorado Permit/job #: C-96-083 <br />Date : 1110212009 County :Delta Abbreviation : none <br />User : JRS Site: Bowie No. 2 Mine Filename :C083-010 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action 2009 Midterm Review <br />Task description :Puff Material Back Onto Train Loadout Facilities and Railbed Benches <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 365B L Series 11(2005) Horsepower : 404 <br /> Weight (MT) : 70.25 <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $76.39 NA Shift basis : 1 per day <br />Operating cost/hour : $102.49 100 Data source : (CRG) <br />Operator cost/hour : $38.72 NA <br />Total unit cost/hour : $217.59 Total fleet cost/hour : $435.19 <br /> <br />MATERIAL QUANTITIES x <br />Initial Swell Loose <br />volume : 231,495 LCY factor : NA volume : 231,495 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : SEVERE <br />Secondary job condition within basic description : SEVERE <br />Cycle time value : 0.57 minutes <br />Bucket Capacity <br />Rated bucket capacity : 3.27 LCY (heaped) Bucket size class : small <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 2.78 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 5,900 feet Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Unadjusted hourly unit production : 292.58 LCY/hour <br />Adjusted hourly unit production : 242.84 LCY/hour <br />Adjusted hourly fleet production : 485.68 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 2 excavator(s) Total job time : 476.64 hours <br />Unit cost : $0.896 per LCY Total job cost : $207,428
The URL can be used to link to this page
Your browser does not support the video tag.