Laserfiche WebLink
PROJECT IDENTIFICATION <br />Date : 03-Nov-09 Permit C-1996-083 Site: Bowie No. 2 M ine <br />User: JRS State : Colorado <br /> Filename: C083-00h County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: 2009 Midterm Review <br /> Topsoil Replacement Tasks - Tasks 110-131 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />110 Replace Topsoil from Stockpile A to Portal/Utility Area 670.39 $289,417 <br />111 Replace Topsoil from Stockpile A to Truck Loadout/Coal Stockpile Area 43.81 $18,915 <br />112 Replace Topsoil from Stockpile F to Train Loadout 41.44 $17,890 <br />113 Replace Topsoil from Stockpile A to B-Seam Portal Bench 90.12 $38,907 <br />114 Replace Topsoil from Stockpile to Freeman Gulch Vent Shaft Pad 0.91 $933 <br />115 Replace Topsoil from Stockpiles C and D to Pond C and Gob Pile Pond 13.47 $5,815 <br />116 Replace Topsoil from Stockpile to Pond F 5.72 $1,015 <br />117 Replace Topsoil from Stockpile F to Pond J 2.94 $1,269 <br />118 Replace Topsoil from Stockpile F to Pond K 1.98 $853 <br />119 Replace Topsoil from Stockpile to Light-Use Roads from MR's and TR's 22.02 $22,600 <br />120 Replace Topsoil from Stockpile to Drill Pads from MR's and TR's 26.57 $27,275 <br />121 Replace Topsoil from Stockpile A to Prep Plant Bench 23.07 $9,960 <br />122 Replace Topsoil from Stockpile to Material Storage Area 0.18 $188 <br />123 Replace Topsoil from Stockpile E to Gob Pile #2 29.62 $12,788 <br />124 Replace Topsoil from Stockpile to Gob Pile #2 98.62 $42,577 <br />125 Replace Topsoil from Stockpile to Gob Pile #3 137.09 $59,185 <br />126 Replace Topsoil from Stockpile to Haul Road 0.17 $172 <br />127 Replace Topsoil from Stockpile to Water Tank Bench 1.76 $758 <br />128 Replace Topsoil from Stockpile G to TR-35 Drill Pad and Light-Use Road 5.15 $2,225 <br />129 Replace Topsoil from Stockpile to Borrow Area 5.44 $5,588 <br />130 Replace Topsoil from Stockpile to Upper Parking Lot Expansion 0.44 $112 <br />131 Replace Topsoil from Stockpile to Hubbard Creek Vent Shaft Pad 0.74 $758 <br /> <br /> <br /> <br /> <br /> <br /> Total Direct Cost 1,221.65 $559,200 <br />jrs 03-11-09