My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981019 (23)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
_INSPECTION - C1981019 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 2:06:46 PM
Creation date
11/4/2009 1:03:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
10/14/2009
Email Name
JRS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo C-1981-019 <br /> 14 Oct 2009 <br /> Pg 4/b eo)�� <br /> Backfilling and Grading (cont.): <br /> GPS Pt PMT Grade Elev. PMT PMT <br /> ID Elevation Elevations Line Distance Change Grade Change Grade <br /> 32 7259.5 7285.0 <br /> 34 7233.5 7260.0 <br /> 37 7186.4 7200.0 <br /> 49 7274.6 7320.0 <br /> A: Relative Elevation from Trimble GeoXT Handheld GPS Unit <br /> B: PMT Estimated from Map 19-Post-Mining Topography <br /> C: Distance Measured from GPS Data <br /> D: Relative Elevation Change <br /> E:This is a Fairly Shallow Grade at the top of the South Side of the East Pit Reclamation. <br /> The Division Believes That Its Grade Is In Error. This Grade Will Be Rechecked In November. <br /> - As noted in last month's inspection report, Colowyo has completed approximately <br /> 55 acres of backfilling and grading in the West Pit. This area is in the lower portion of <br /> Taylor Draw along the west side of the West Pit just above the East Taylor Pond. <br /> During the last inspection Colowyo was just finishing the topsoil replacement in the <br /> area. That topsoil replacement was completed and Colowyo has cut several <br /> contour ditches into the reclamation in the West Pit. These ditches have a slight <br /> grade to help ensure positive drainage. They flow into the lower portion of the Taylor <br /> Tributary Ditch, which flows into the East Taylor Pond. The Division did not take any <br /> elevation or grade measurements in the West Pit reclamation area but plans to do so <br /> in November (or as weather permits). <br /> Topsoil: - Colowyo (using the Bower Brothers contractors) has finished removing the <br /> topsoil in the Taylor Draw area for the end of the A-A' underdrain for the West Taylor <br /> Fill. This topsoil was removed by Bower Brothers and hauled onto a bench in the <br /> South Taylor Pit area and temporarily stockpiled. The stockpile is being moved to its <br /> permanent location just east of the final cut of the Section 16 Pit (where the majority <br /> of the South Taylor topsoil has been placed) by Colowyo. Most of the topsoil has <br /> been moved and Colowyo expected to finish moving the remaining topsoil before <br /> the end of the week. They were held up by ICG, who was demobing the highwall <br /> miner from the site. Based on the aerial pictures taken by Harry Ranney of CDRMS at <br /> approximately 14:30 on 15 October 2009, it appears that all of this topsoil has been <br /> removed from its temporary stockpile location. <br /> - Colowyo has sloped and seeded the large topsoil stockpile that is just east of the <br /> final cut of the Section 16 Pit. This is the stockpile where the majority of the South <br /> Taylor topsoil has been placed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.