Laserfiche WebLink
eldle <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />PROJECT NAME: West Elk Refuse Pile Expansion PROJECT NUMBER: M09011MT <br />CLIENT: Mountain Coal Company DATE: Aug/10/09 <br />PROJECT LOCATION: Somerset SAMPLE NO: 1552 <br />SAMPLE DESCRIPTION: Coal Gob, Black SOURCE: Composite of location at elevations <br />6191.14 to 6200.12 at Refuse Pile <br />Expansion <br /> NATURAL MOISTURE CONTENT <br />TEST HOLE MOISTURE TEST HOLE MOISTURE <br /> CONTENT (%) CONTENT (%) <br />RPE 01 5.8 RPE 10 11.8 <br />RPE 02 13.4 RPE 11 12.4 <br />RPE 03 10.6 RPE 12 10.9 <br />RPE 04 12.4 RPE 13 11.4 <br />RPE 05 12.5 RPE 14 12.7 <br />RPE 06 11.5 RPE 15 10.0 <br />RPE 07 9.9 RPE 16 10.3 <br />RPE 08 11.4 RPE 17 9.8 <br />RPE 09 9.3 RPE 18 10.8