My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-02_REPORT - C1980007
DRMS
>
Day Forward
>
Report
>
Coal
>
C1980007
>
2009-11-02_REPORT - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:39 PM
Creation date
11/3/2009 11:07:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REPORT
Doc Date
11/2/2009
Doc Name
3rd Quarter 2009 Stockpile and Site Inspection Report
From
Mountain Coal Company, LLC
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mtb Pvmariatez <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Thursday, Jul19109 Arrive Time: 10:00 AM <br />Depart Time: <br />Project Name: West Elk Refuse Pile <br />Expansion Weather: Clear <br />Project Number: M09011MT <br />Laboratory#1516 Temp: <br />Client: Mountain Coal Company Client Representative: Larry Gillenwater <br />General Contractor: West Elk Mine Supervisor: Larry Gillenwater <br />Specialty Contractor: Sickles Construction Specialty Superintendent or Foreman: Chuck Sickles <br />Source of Fill Material: Plans and Specs: N/A <br />Prepared by: Dated: <br />Contractor's Equipment Used: Water truck, dozers, loaders, excavators and vibratory sheepsfoot compactor <br />Lambert and Associates Equipment Used - Manufacturer: CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given On-Site to: Moisture content samples were obtained. <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed: No <br />Unusual Conditions Observed: No <br />If yes, who was contacted? <br />Follow-up from Prior Visit: Retests Performed: None <br />Concerns for Next Visit: None Retests Needed: None <br />Other personnel contacted on-site: namelfirm <br />Notes: <br />l performed nuclear field density tests, as requested by Chuck Sickles, of material being placed at the Refuse Pile <br />Expansion. Please refer to the test results sheets for approximate test locations and test results. The test results <br />indicate only the relative compaction and soil moisture content of the material tested at the elevation and location <br />tested at the time of our site visit. <br />Lambert and Associates Technician: Hayes
The URL can be used to link to this page
Your browser does not support the video tag.