Laserfiche WebLink
APPROVED HYDROLOGICAL MONITORING PROGRAM <br />Table 2.04.7-1 summarizes various current approved monitoring sites. They are shown on <br />Map 2.04.7-1-F. For New Horizon 2 Mine, the sites are based upon recommendations made <br />by Greystone Consultants and subsequent revisions requested by WFC.The monitoring plan <br />revised as per TR38 will be adequate for the Garvey and Burbridge leases included in the <br />permit boundary and other mining areas to the west-northwest that WFC intends to include <br />within the permit boundary in the near future. TR-47 resumes the monitoring of wells GW-N16, <br />GW-N17 and GW-N18. <br />Map 2.04.7-1-F shows the locations of surface stations and wells for the New Horizon Mine 2 <br />monitoring program. Modifications to the existing monitoring locations for surface and <br />groundwater are discussed below. All data will be reported in the annual hydrology report.