My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-30_REVISION - C1982056 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2009-10-30_REVISION - C1982056 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:37 PM
Creation date
10/30/2009 3:32:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
10/30/2009
Doc Name
Proposed Decision Letter & Form
From
DRMS
To
Twentymile Coal Company
Type & Sequence
PR8
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />October 30, 2009 <br />Jerry Nettleton <br />Twentymile Coal Company <br />29515 Routt County Road 27 <br />Oak Creek, CO 80467 <br />Re: Foidel Creek Mine (Permit No. C-1982-056) <br />Proposed Decision <br />Permit Revision Application No. 8 (PR-8) <br />Dear Mr. Nettleton: <br />COLORADO <br />D I V I S I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision Package for Permit <br />Revision No. 8 at the Foidel Creek Mine. Notice of the proposed decision will be published in the Steamboat Pilot <br />as soon as possible. The first publication will initiate the thirty (30) day public comment period for the Division's <br />decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision application <br />was sent to the Office of Surface Mining and the Bureau of Land Management. The material should be sent within <br />15 days of final approval. <br />Please be advised that federal mine plan approval needs to be obtained from the Office of Surface Mining <br />Reclamation and Enforcement (OSM). OSM approval, in addition to State permit approval, is required, before <br />operations affecting federal coal may commence. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of Bond <br />Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the Revised <br />Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond that equals or <br />exceeds the Revised Liability. This Permit Revision must not be implemented until this proposed decision <br />becomes final and until any required increase in bond is submitted to and approved by the Division. <br />If there are stipulations attached, please sign and return the proposed decision form to the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />Janet . Binns <br />Enviro ental Protection Specialist <br />Enclosure(s) <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.