My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-29_REVISION - C1982056 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2009-10-29_REVISION - C1982056 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:35 PM
Creation date
10/30/2009 10:28:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
10/29/2009
Doc Name
Email Regarding Revised Pages
From
Jerry Nettleton
To
Janet Binns
Type & Sequence
PR8
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
treatment, and will be mixed with receiving stream waters. Total Recoverable Iron will be removed by the FCB <br />treatment facility at Site 115. <br />Dissolution of soluble minerals will occur as a result of the process of dewatering and handling of discharged <br />water from the underground mine. Because ongoing underground mining opearations, and adjacent surface <br />mined areas are located in areas recharging groundwater to the overburden unit,. hydro-geochemical changes in <br />water flowing through this unit have already occurred and are expected to continue. The supporting analysis <br />conducted to assess these changes is included in the groundwater PHC section. <br />PR09-08 2.05-164.1 10/29/09
The URL can be used to link to this page
Your browser does not support the video tag.