Laserfiche WebLink
4 (Form 2- Public) <br />5. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Six U air/air mist rotary holes are proposed. Access will be by over-the-ground travel. No <br />road construction will occur. A total of about 1,500 feet of OTG access will be needed. No <br />surface disturbance or the drill pads or access trail is anticipated. A small mu pit (11 Oft x t x <br />6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 6 Average Width 30 (ft) Average Length 65 (ft) <br />B. Drill Holes: Quantity 6 Depth 810 (ft) Diameter (in) <br />C. Mud Pits: Quantity 6 Average Width 10 (ft) Average Length 10 (ft) <br />Average Depth 3 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />D. Other Disturbances (please describe): <br />None ------------------------------------------------- -------------------------------------------------------------- <br />E. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />< 200 gal diesel fuel and 55 gal or less motor oils and / or hydraulic fluids used by drill rigs <br />and support vehicles. Fuel, oils and fluids will be stored in the beds of the support <br />vehicles an remove from the drilling area at the en o eac ay. <br />F. New Road(s): Length None (ft) Width (ft) <br />Significantly Upgraded Road(s) Length None ($) Width (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />None proposed