My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REVISION - 10/30/2009, 7:49:10 AM-JWD
DRMS
>
Public
>
REVISION - 10/30/2009, 7:49:10 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:33:52 AM
Creation date
10/30/2009 8:03:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
REVISION
Doc Date
10/28/2009
Doc Name
Response to Division
From
Powertech (USA) Inc.
To
DRMS
Type & Sequence
MD3
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Centennial Project, Completeness Issues of Notice of Intent Modification MD-03, File No. P-2008-043 <br />1. Provide a plan for cleaning and testing water containment vessels and appurtenances to <br />demonstrate that they will not be a source of contamination. <br />Please refer to Completeness Issue Item #1 Attachment for the Powertech (USA) Inc. (Powertech) <br />Produced Water Vessel - Cleaning and Inspection Procedure. All cleaning and inspection procedures <br />outlined in the Powertech Produced Water Vessel - Cleaning and Inspection Procedure will be adhered. <br />to and will be certified as complete before water containment vessels are brought on the site. All <br />manifolds, valves, and transfer pumps will be cleaned as described in the attached procedure. <br />Additionally, piping will be new and National Sanitation Foundation or otherwise certified for potable <br />water. <br />2. Provide details on the specific type(s) of water containment vessels to be deployed. <br />Water containment vessels will be fully enclosed and obtained through Rain for Rent. Please refer to <br />Completeness Issue Item #2 Attachments for a photograph of the type of water containment vessel to <br />be used and a diagram showing the dimensions of the vessels. <br />3. DRMS will require that all injection wells be specified in MD-03; there will be no latitude to use <br />wells for injection that have not been specifically approved by DRMS for that purpose. At this <br />time, the only potential injection well identified in MD-03 is well IN08-33-PWI. <br />• Powertech is in agreement and will comply with this completeness item. At this time, only IN08-33-PWI <br />has the potential to be utilized as an injection well, as has been identified in MD-03. <br />4. DRMS requires the submittal of mechanical integrity test results, electrical resistivity logs, and <br />well completion reports for all injection wells. <br />Please refer to Completeness Issue Item #4 Attachments for the results of mechanical integrity testing <br />and well completion details for IN08-33-PWI. <br />S. Provide details on the fence to be installed around the pump test facilities. <br />Fencing will be installed around the pump test facilities in such a way to restrict entrance by livestock, <br />and in accordance with the specifications requested by the landowner. Fencing will consist of four- <br />strand barbed wire with the bottom wire located 16 inches from the ground surface and the top wire <br />located 48 inches above the ground surface. The two remaining wires will be evenly spaced between <br />the bottom and top wires. Corner posts will be #1 treated 6" X 8" rail-road ties, and will be planted at <br />least 4 feet into the ground. Gateways will also be strengthened to prevent sagging with rail-road ties <br />mounted at each end. Between the rail-road tie corner posts, steel T-posts that are 6 feet in length will <br />be placed every 16 feet. Additionally, 2 stays will be evenly spaced between all corner posts and T-posts <br />in order to prevent sagging. <br />•
The URL can be used to link to this page
Your browser does not support the video tag.