Laserfiche WebLink
POWERTECh (USA) l « <br />• • Radiological measurements using an alpha and gamma probe shall be conducted on the <br />containment vessel before it is utilized onsite and, again, after onsite use; all readings will be <br />documented on the appropriate Powertech form. <br />• Powertech employees shall not enter the tank without proper confined space entry training and <br />appropriate work permit, unless authorized by the mine manager and deemed safe by the <br />onsite representative of the EMS Department. <br />• Radiological measurements of the interior shall be made through the portholes and man-ways <br />of the vessel. <br />• Initially, natural background radiation levels shall be measured and recorded. <br />• Gate: l s+^- .2. &of <br /> <br />2 1 P a v e <br />Completeness Issue Item #1 Attachment