My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-29_REVISION - M1987049 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987049
>
2009-10-29_REVISION - M1987049 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:06:04 PM
Creation date
10/30/2009 8:03:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
REVISION
Doc Date
10/29/2009
Doc Name
Witness and Exhibit List, McCanne Ditch and Reservoir Company
From
DRMS
To
File
Type & Sequence
AM2
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENT "BY=CHC <br />A <br />l ? +1 <br />4-14-97 3 = 37P { 3038619026- 9703661111; 9 - 7/- 8. -.- . <br />b. Maintenance of water elevation in the three lakes is essential <br />maintaining the flow of water in the McCanne Ditch. Redy nixed agrees that <br />it will set the overflow pipes between the three lakes*.!'- s depicted on i:xhibit A, <br />at such elevations as to maintain a water elevation of 4,965.0 feet in the north <br />lake, labeled if., III and IV on Exhibit A, a water elevation of .4,9 70.0 feet in <br />the middle lake, labeled V and V1 on Exhibit A, and a water elevation of 4,973.0 <br />feat in the south lake, labeled VII and VIII on E=xhibit A. Furthermore, Ready <br />Nixed will cover the dikes with overburden material along the west side of each <br />of the lakes and the northwest side of the north lake to reduce seepage to the <br />river and along the east side of the north lake to minimize the hydraulic connectiion- <br />between the ditch and the lake. Ready Mixed will construct a controlled overflow <br />from the northeast corner of the north pond into the. McCanne Ditch of at least <br />ten inches in diameter to allow the controlled overflow of water into the McCanne <br />Ditch_ <br />7. To prevent damage to the McCanne Ditch as a result of flooding, a <br />depression in the dike should be placed in the north lake on the north or northwest <br />portion of the dike as an emergency spillway so flooding water will go to the <br />river. Ready Nixed may, as required by. the Urban Drainage and Flood Control <br />District, incorporate this depression into the Urban Drainage and Flood Control <br />District requirements. <br />8• Any proposed changes in the mining plan must be approved by McCanne. <br />9. McCanne agrees it will not raise any objections, legal or otherwise, <br />y- to Ready Mixed`s application to the Mined Land Reclamation Board for a mining <br />permit nor object in any way to Ready Mixed obtaining the required zoning and <br />state permits to allow it to operate the mine on the subject property; <br />10.. This Agreement shall be a covenant running with the land, shall be <br />binding upon the parties, their heirs, personal representatives, administrators, <br />successors and assigns and shall be enforceable against the same. <br />ll. This document represents the complete agreement of the parties hereto <br />and no oral modification shall be recognized. Any amendments or additions to <br />Chis Agreement shall be made in writing signed by the parties. <br />IN WITNESS WHEREOF the McCanne Ditch and Reservoir Company has, by the <br />au rthority of Its Board of Directors, caused this Agreement to be executed <br />by its President and attested by its Secretary and Ready Mixed Concrete Company <br />has, by the authority 'of irs Board of Dire cto rs, caused this Agreement to be <br />executed by its President and attested by its Secretary. <br />DATED the day and year first written above. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.