My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-27_HYDROLOGY - M1977081
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977081
>
2009-10-27_HYDROLOGY - M1977081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:30 PM
Creation date
10/28/2009 7:34:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977081
IBM Index Class Name
HYDROLOGY
Doc Date
10/27/2009
Doc Name
Substitute Water Supply Plan
From
OSE
To
Applegate Group, Inc.
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Sira Sartori <br />Greeley West Pit SWSP (M-77-081) <br />October 19, 2009 <br />Page ?4 <br />9. The name, address, and phone number of the contact person who will be responsible for the <br />operation and accounting of this plan must be provided on the accounting forms submitted to <br />the division engineer and the water commissioner. <br />10. Adequate accounting of depletions and replacement must be provided to the division <br />engineer in. Greeley and the water commissioner on a monthly basis or other interval <br />acceptable to both of them. The accounting form is subject to modification and approval by <br />the division engineer. All amounts shall be in acre-feet. <br />11. This substitute water supply plan may be revoked or modified at any time should it be <br />determined that injury to other vested water rights has or will occur as a result of this plan. <br />Should this supply plan expire without renewal or be revoked prior to adjudication of a <br />permanent plan for augmentation, all use of ground water must cease immediately. <br />12. If reclamation of the mine site produces a permanent water surface exposing groundwater to <br />evaporation, an application for a plan for augmentation must be filed with the Division 1 <br />Water Court at least three years prior to the completion of mining to include, but not be <br />limited to, long-term evaporation losses and lagged depletions. If a lined pond results after <br />reclamation, replacement of lagged depletions shall continue until there is no longer an effect <br />on stream flow. Granting of this plan does not imply approval by this office of any such court <br />application(s). <br />13. In accordance with amendments to §25-8-202(7), C.R.S., and "Senate Bill 89-181 Rules and <br />Regulations" adopted on February 4, 1992, the State Engineer shall determine whether the <br />substitute supply is of a quality to meet requirements of use to senior appropriators. As <br />such, water. quality data or analysis may be requested at any time to determine if the water <br />quality is appropriate for downstream water users. <br />14. The decision of the state engineer shall have no precedential or evidentiary force, shall not <br />create any presumptions, shift the burden of proof, or serve as a defense in any pending <br />water court. case or any other legal action that may be initiated concerning this plan. This <br />decision shall not bind the state engineer to act in a similar manner in any other applications <br />involving other plans, or in any proposed renewal of this plan, and shall not imply <br />concurrence with any findings of fact or conclusions of law contained herein, or with the <br />engineering methodologies used by the Applicant. <br />If you have any questions concerning this approval, please contact loana Comaniciu in <br />Denver at (303) 866-3581 or Dave Nettles in Greeley at (970) 352-8712. <br />Sincerely, <br />Jeff Deatherage, P.E., <br />Water Resource Engineer
The URL can be used to link to this page
Your browser does not support the video tag.