Laserfiche WebLink
EXHIBIT D <br />MINING PLAN <br />Mining will sta <br />and south tow, <br />area will be ev <br />approximately <br />excavated slop <br />The excavated <br />primary jaw, a <br />separate prods <br />The various pro! <br />out of the pit by <br />will be mined o? <br />equipment will E <br />enable the plans <br />by landowners <br />at the northeast corner of the expanded area and proceed west <br />ds the southwest corner of the new area (shown in blue). The <br />vated with tracked dozers and rubber tired loaders to a depth aof <br />Z16 feet. Maximum depth will be approximately 25 feet; no <br />will exceed 3:1. <br />will be fed into a portable crusher plant consisting of a <br />v cone crusher and various screens and conveyors to <br />lucts will be stockpiled within the permit area and transported <br />truck over the existing access road. The newly expanded pit area <br />er a 10 over a 5 year period and the crushing and processing <br />emain in the older area originally permitted in 2002. This will <br />to remain within the existing berm, thus being hidden from view <br />orimaniv to the east and across CR D.S. <br />Sanitary facilities include a portable toilet and a solid waste container provided by <br />a lacal wate hauling contractor. <br />f <br />i <br />i