Laserfiche WebLink
4. Revised page 2.05-74.2 has lost text previously approved during TR66 (page revised date <br />02117109). The paragraph discussing the "light-use road to 18-Left Ventilation Shaft <br />Installation" has been eliminated with the TR69 revised text. Please reinstate this previously <br />approved information. <br />Response: The referenced page has been reviewed and revised to include the deleted text. Copies of <br />the revised page(s) accompany these responses for replacement in the PAP. <br />5. TCC provided a reclamation cost estimate for the proposed activity. The Division has evaluated <br />TCC's estimate and has evaluated reclamation costs using the CIRCES program. The <br />Division's estimate was less than TCC's. Tcc's reclamation cost estimate is acceptable. Please <br />find a copy of DRMS's estimate for the tasks proposed for TR69, attached to this letter. If TCC <br />prefers to use the Division's estimate, please resubmit revised pages to be inserted into the Foidel <br />Creek permit. <br />Response: TCC accepts the Division's cost estimate. A revised bond calculation sheet accompanies <br />these responses for replacement in the PAP.