My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-26_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2009-10-26_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:29 PM
Creation date
10/26/2009 3:01:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
10/26/2009
Doc Name
Supplemental EA (Email)
From
Carl Johnston
To
Dan Hernandez
Type & Sequence
PR6
Email Name
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
chokecherry and only dominates east facing slopes. At the lowest elevations, serviceberry and <br />chokecherry give way to a community dominated by sagebrush, rabbitbrush and grasses. <br />Specifically, the mining plan action proposed by Trapper Mining, Inc. consists of recovering <br />approximately 8.1 million tons of Federal coal, disturbing 312 acres that were previously <br />affected by a landslide, within the area covered by Colorado State permit C-1981-010 during the <br />2008 - 2012 permit term. In addition, this mining plan modification will also authorize the <br />recovery of approximately 25.5 million tons of Federal coal during the life of the Trapper mine <br />that was previously included in the approved permit area. The mining operations use a <br />combination of dragline, truck/loader and limited highwall miner mining methods. The average <br />production rate is approximately 2.3 million tons per year from the "H," "I," "J," "K," "L," "M," <br />"Q," and "R" coal seams and is approved to reach a maximum production rate of 2.6 million tons <br />per year. <br />PR-6 would not increase from its present 10,382.3 acres and surface disturbance within the <br />approved State permit area would increase by 312 acres from its present 3,288.6 acres to a new <br />total of 3,600.6 acres. No acres of Federal surface land, 4,663 acres of Federal coal and 25.5 <br />million tons of Federal coal remain within the current permit area. The current life of the <br />approved mining operation within the approved permit area is estimated to be approximately <br />eleven (11) years. The Colorado Division of Reclamation, Mining and Safety approved PR-6 on <br />September 22, 2009. <br />Pursuant to 30 CFR Part 746, the Office of Surface Mining Reclamation and Enforcement <br />(OSM) is recommending that the Assistant Secretary approve the mining plan modification <br />without special conditions. <br />The Surface Mining Control and Reclamation Act of 1977 (SMCRA) gives OSM primary <br />responsibility to administer programs that regulate surface coal mining operations on Federal <br />lands. Pursuant to Section 503 of SMCRA, the CO-DRMS developed, and the Secretary of the <br />Interior approved, a permanent program authorizing the CO-DRMS to regulate surface coal <br />mining operations and the surface effects of underground coal mining on non-Federal lands <br />within the State of Colorado. In September 1982, pursuant to Section 523(c) of SMCRA, the <br />CO-DRMS entered into a cooperative agreement with the Secretary of the Interior authorizing <br />the CO-DRMS to regulate surface coal mining operations and the surface effects of underground <br />coal mining on Federal lands within the State of Colorado. <br />Pursuant to the cooperative agreement, Federal coal lease holders in Colorado must submit a <br />permit application package to OSM and the CO-DRMS for proposed mining and reclamation <br />operations on Federal lands in the State. The CO-DRMS reviews the permit application package <br />to ensure that it complies with the permitting requirements and that the coal mining and <br />reclamation operations will meet the approved permanent program's performance standards. If it <br />does comply, the CO-DRMS issues the applicant a permit to conduct coal mining and <br />reclamation operations. OSM, the Bureau of Land Management, and the U.S. Fish & Wildlife <br />Service reviewed the permit application package to ensure that it complies with the terms of the <br />Federal coal lease; the requirements of the Mineral Leasing Act of 1920; the National <br />Environmental Policy Act of 1969; and other Federal laws and their attendant regulations. <br />-2-
The URL can be used to link to this page
Your browser does not support the video tag.