Laserfiche WebLink
<br />If the operator wishes, at any time, to relocate activities to avoid the expense of mitigation and/or the <br />delays associated with this process, the AO will assume responsibility for whatever recordation and <br />stabilization of the exposed materials may be required. Otherwise, the operator will be responsible for <br />mitigation cost. The AO will provide technical and procedural guidelines for the conduct of mitigation. <br />Upon verification from the AO that the required mitigation has been completed, the operator will then <br />be allowed to resume construction. <br />4. ROW access off of RBC 24 shall be gated to deter traffic from using the pipelines paralleling RBC <br />24.