My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-19_INSPECTION - M1988057
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1988057
>
2009-10-19_INSPECTION - M1988057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:16 PM
Creation date
10/22/2009 2:21:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988057
IBM Index Class Name
INSPECTION
Doc Date
10/19/2009
Doc Name
Inspection report
From
DRMS
To
Robert S. Scott
Inspection Date
9/18/2009
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 16-Oct-2009 Permit or job no. M-1988-057 Site :Canyon Sand & Gravel Pit <br />User : WHE <br />Abbreviation <br />Filename <br />none <br />State :Colorado <br />M057-000 County :Archuleta <br />Agency or organization name : DRMS <br />Permit or job action : TR-01 <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />001 -Load, carry & place topsoil, 0.5' deep over 0.5 acre area loader 1 2.3 $197 <br /> <br />002 -Revegetate one acre affected land revege 1 4.0 $272 <br /> <br />003 -Haul reclamation equipment to and from job site mobilize 3 4.0 $1,171 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 10.3 $1,640 <br />* includes inflation factor adjustment of : NA % TOTAL DIRECT COST $1,640 <br />. . <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $33 <br />Performance bond : 1.05 % of direct total = <br />Job superintendent : NA* NA NA total = <br />Profit : 10.00 % of direct total = <br />$17 <br />/VA <br />$164 <br />* not required (or eqp. operator serves as super.) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - <br />Financial warranty processing (legal/related costs) <br />Engineering work and/or contract/bid preparation <br />CONTRACT AMOUNT (direct + O & P) _ <br />total $ NA total = <br />NA NA total = <br />? 7, tf54 <br />$0 <br />NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $93 <br />CONTINGENCY - NA* NA total = NA <br />* contingencies accounted for at task level TOTAL INDIRECT COST = $307 <br />TOTAL BOND AMOUNT (direct + indirect) _ $1,947 <br />TOTAL O & P = $214 <br />0.00 <br />NA
The URL can be used to link to this page
Your browser does not support the video tag.