My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-16_INSPECTION - M1990057
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1990057
>
2009-10-16_INSPECTION - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:13 PM
Creation date
10/20/2009 1:36:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
INSPECTION
Doc Date
10/16/2009
Doc Name
Item #5 corrective action follow-up
From
The Union Milling Company
To
DRMS
Inspection Date
6/18/2009
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f? erato?° lies ornse - Additional[ extensione uest ila??otection and disposal <br />September 22, 2009 <br />The Division responded on August 27, 2009, requesting UMC to re-run a sample of the ore using <br />the SPLP method. Additionally, the Division required UMC to document the ore stockpiles do <br />not have the potential to produce acid mine drainage. <br />jMC is proceeding with the covering of the 3-piles with visqueen, as discussed in the August <br />24, 2009 response. The material has been purchased and will be installed within the next several <br />weeks. This is a temporary measure to significantly reduce water infiltration into the stockpiles, <br />aegating acid mine drainage potential from weather. <br />Additionally, LJMC. commits to the following as methods to keep the visqueen covered stockpile <br />storage to a minimum in terms of quantity or time, and provide adequate measures to prevent <br />release of contaminants. <br />• temporary storage of the existing material; no additional material added to the piles; <br />only minimal disturbances to the existing piles for maintenance <br />0 ongoing maintenance and replacement as needed. of the visqueen material <br />® perform SPLP analysis, as outlined in the Division`s August 27, 2009 letter, of a <br />representative sample(s) from the stockpiles prior to removal and milling or disposal <br />of the material <br />provide the Division with a iaterial movement schedule based on SPLP testing <br />results demonstrating adequate measures to prevent release of contaminants following <br />disposal <br />® initiate removal of the material within 60 days following resumption of milling <br />operations <br />UMC requests a 30-day extension to complete Covering the piles with visqueen. Pictures of the <br />covered stockpiles will be provided to the Division.
The URL can be used to link to this page
Your browser does not support the video tag.