My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-19_PERMIT FILE - M2009054 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009054
>
2009-10-19_PERMIT FILE - M2009054 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:17 PM
Creation date
10/20/2009 1:10:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009054
IBM Index Class Name
PERMIT FILE
Doc Date
10/19/2009
Doc Name
Answers to Adequacy Review #1
From
Banks and Gesso, LLC
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
temporary vegetation will not be established on these piles, please explain <br />how they will be protected from wind and water erosion. <br />Response: To control erosion, the stored overburden, imported soil, and <br />imported manure stockpiles will be broadcast seeded each year between <br />October 15 and November 30 with the following seed mix: <br />Common Name Grasses Variety PLSlac <br />Western Wheat grass Arriba 4.0 <br />Rye Annual 8.0 <br />6.4.6 Exhibit F - Reclamation Plan Map <br />Please portray the proposed land use for each of the affected land. This <br />could be a note on the Reclamation Plan map that states the entire affected <br />land will be reclaimed to Rangeland for the post mining land use. <br />Response: Please refer to Note 7 on the Reclamation Plan Map for a note <br />on post mining land use. A revised copy of Exhibit F is enclosed. <br />6.4.12 Exhibit L - Reclamation Costs <br />What will be the dimensions (height, length and width) of the asphalt plant, <br />and what material will it be made from? Will this plant be built on a concrete <br />pat/foundation? If so, what will be the dimensions (length, width and depth) <br />of the pad? <br />Response: The operator eliminates the asphalt plant from this application. <br />2. Based on the "point of maximum reclamation" described in Exhibit L and the <br />plan for importing growth media to augment the topsoil, the Division will <br />need to hold a bond for importing this material. Based on the December, <br />2008 inspection, it appeared little to no topsoil/growth media was stockpiled <br />on the site for reclamation. Is this still the case? If not, please estimate how <br />much growth media is currently on the site for reclamation. <br />Response: There is no growth medium on the site now. The existing <br />northem and southern stockpiles will be used for backfilling the mining <br />faces. <br />Over the 18.5 acres of new mining area (per Adequacy Response #2), we <br />expect to recover two inches (0.166 feet) of overburden soil, which will be <br />disked into the imported soil and manure to produce the grass growth <br />media.
The URL can be used to link to this page
Your browser does not support the video tag.