My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-19_PERMIT FILE - M2009054 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009054
>
2009-10-19_PERMIT FILE - M2009054 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:17 PM
Creation date
10/20/2009 1:10:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009054
IBM Index Class Name
PERMIT FILE
Doc Date
10/19/2009
Doc Name
Answers to Adequacy Review #1
From
Banks and Gesso, LLC
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ON Banks and Gesso, LLC <br />No <br />October 16, 2009 <br />41 <br />?OCT 1 ? ?!?C9 <br />Divislor, of e1r3t.1r.1Y7ii ` S.i>il, <br />Mining cnd <br />Mr. Jared Ebed <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street - Room 215 <br />Denver, CO 80203 <br />720 Kipling St., Suite 117 <br />Lakewood, Colorado 80215 <br />(303) 274-4277 <br />Fax (303) 274-8329 <br />www.banksandgesso.com <br />e_--- I/ <br />RE: Answers to Adequacy Review #1, File # M-2009-054 <br />Proctor Pit, Otero County <br />All-Rite Paving and Redi-Mix <br />Dear Mr. Ebert, <br />Following are the responses of the applicant to the comments raised in your <br />September 22, 2009 Adequacy Letter #1: <br />6.4.4 Exhibit D - Mining Plan <br />1. Concerning the Special Operations permit (M-2004-055), once the 112 <br />permit is issued and a properly executed performance and financial <br />warranty is in place for the 112 operation, the operator will need to submit a <br />full Performance and Financial Warranty release request for the M-2004- <br />055 permit in accordance with Rule 4.17 of the Construction Materials Rules <br />and Regulations. <br />Response: Per your direction, the operator will request a full Warranty <br />release request for M-2004-055. <br />2. According to the mining plan, the active mining area will be approximately 5- <br />10 acres in size. The pit highwall was measured during the December 15, <br />2008 inspection and found to be 1,200 feet in length. For the remainder of <br />the operation, at the point of maximum disturbance how long will the mining <br />highwall be? <br />Response: The volumes to backfill to the mining faces are a product of the <br />parameters in the table below.
The URL can be used to link to this page
Your browser does not support the video tag.