My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-20_PERMIT FILE - M2009074
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009074
>
2009-10-20_PERMIT FILE - M2009074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:19 PM
Creation date
10/20/2009 1:10:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009074
IBM Index Class Name
PERMIT FILE
Doc Date
10/20/2009
Doc Name
Decision Letter
From
DRMS
To
Colorado Backhole Service
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : DRMS <br />Permit or other job action : NEW APPLICATION <br />Task description :APPLY TOPSOIL OVER 9.9 ACRES <br />HOUR <br />LY EQUIPMENT COST .......... <br /> Basic machine : Cat D8R Series II - 8SU (200: Horsepower : 310 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shiftbasis : 1 perday <br /> Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $54.99 NA <br /> Operating cost/hour : $96.18 100 <br /> Ripper op. cost/hour : $3.65 50 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $193.35 Total fleet cost/hour : $193.35 <br />MATERIAL QUANTITIES <br />....:: :. <br />....:::..:..:........: <br />Initial Swell Loose <br />volume : 7,234 BCY factor : 1.250 volume : 9,042 LCY <br /> <br />Source of estima ted volume : EXHIBIT C <br />Source of estimated swell factor : EXHIBIT C <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 491.9 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile: 0.80 (ind-ro <br /> Push gradient : 1.05 (Cat HB) <br />Average push gradient : 2.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,200 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.51 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 249.58 LCY/hr <br /> Adjusted fleet production : 249.58 LCY/hr <br /> <br />.. <br />JOB TIME AND COST ,:. <br />- <br />.....::::.. . <br />Fleet size : 1 Dozer(s) Total job time : 36.23 Hours <br />Unit cost : $0.775 /LCY Total job cost : $7,005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.