My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1994082 (41)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1994082
>
_INSPECTION - C1994082 (41)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 5:34:05 AM
Creation date
10/20/2009 10:11:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
7/15/2009
Email Name
DTM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Data Pertinent to 7/15/2009 Yoast Bond Release SL-2 Inspection Data Pertinent to Yoast Bond Release SL-2 Inspection <br /> Site# Est.Channel Dimensions Figure 13-12.3-1 Design Site# Comments <br /> 1 2'bw;0.T d,riprap 1 East Fork PM 1-1;Stable Channel.View to north. <br /> 2 _ 2 Aspen rootsprout patch in former stockpile site,upper PM-1-1 drainage. <br /> 3 3 General views of YPM 1-1 upper watershed. <br /> 4 4 Gullies near rootsprout patch due to concentrated flow from remnant stockpile berm and scraper route <br /> 5 8'bw;2'd 2'bw;0.7'd,riprap 5 Stable riprapped channel <br /> 6 6 Gully along fence and parallel to channel;stabilization measures warranted. Fence maintenance. <br /> 7 7 <br /> 8 15'bw;1.5'd 2'bw;1.3'd;grassed 8 Stable riprap/grass channel;rills parallel to channel on west bank from maintenance route. <br /> _9 9 Settling cracks along old highwall;1-3"wide,intermittent along slope for several hundred feet. <br /> 10 8'bw;1'd 2'bw;0.T d;riprap 10 Stable riprap channel;grassing in. <br /> 11 8'bw;2.5'd 2'bw;0.T d;riprap 11 Stable riprap channel. <br /> 12 12 Minor bank scour at bend,upper end of steep section below YPM 5-1Ajunction. <br /> 13 13 Gully source is old scraper route along ridge;need to disperse flow and repair gully <br /> 14 14 Low density volcanic riprap scoured and humped along 50'segment,with some bank scour. <br /> 15 T bw;0.5'd 15 Stable riprapped channel. <br /> 16 10'bw;1'd 2'bw;0.T d;riprap 16 Stable channel;over-filled with riprap but no problems evident. <br /> 17 8'bw;2'd 2'bw;0.8'd;riprap 17 Stable riprapped channel. <br /> 18 8'bw;1.5'd 2'bw;0.6'd;riprap 18 Stable riprapped channel. <br /> 19 8'bw;2'd 2'bw;0.8'd;riprap 19 Stable riprapped channel. <br /> 20 3'bw;2'd 1'bw;0.6'd;riprap 20 Very steep;minor side scour,maintenance recommended. <br /> 21 8'bw;2'd 3'bw;V d;riprap 21 Stable riprapped channel. <br /> 22 7'bw;2'd 3'bw;1.2'd;TRM 22 Stable TRM channel. <br /> 23_ 3'bw;1.5'd 3'bw;0.8'd;TRM 23 Stable TRM channel. <br /> 24 8'bw;3'd 3'bw;1.2'd;TRM 24 TRM channel with minor side scour;healing but warrants monitoring. <br /> 25 25 Poor perennial cover and high rill density in"bowl"at upper end of PM-19 drainage. <br /> 26 2.5'bw;2'd 3'bw;0.7'd;TRM 26 Stable TRM channel. <br /> 27 27 Settling evident in area of backfilled hole. Feature will drain but will need to monitor. <br /> 28 8'bw;3'd 3'bw;1.2'd;TRM 28 Some holes in TRM along section,with resulting scour beneath TRM.Repairs necessary. <br /> 29 29 Slumping along lower slope,with rills parallel to channel. Repairs necessary. <br /> 30 8'bw;1.5'd 3'bw;1.1'd;riprap 30 Recently riprapped segment;sideslopes not effectively riprapped;repairs necessary. <br /> 31 31 Minor regrading recently completed;topsoiling in progress on steep reclaimed haulroad corridor. <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.