My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981018 (24)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981018
>
_INSPECTION - C1981018 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 12:35:07 PM
Creation date
10/20/2009 10:08:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
INSPECTION
Doc Name
OSM Inspection Report
From
OSM
To
DRMS
Inspection Date
9/15/2009
Email Name
JDM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U. S. DEPT. OF THE INTERIOR <br /> OFFICE OF SURFACE MINING <br /> Mine Site Evaluation State Program <br /> Permittee/ WESTERN FUELS-UTAH Permit C-018-81 Field Visit 09/16/2009 Continuation Page <br /> Person Number Date <br /> 28. Performance Standard Categories <br /> Codes: 1=Compliance,2=Noncompliance,3=Not Planned,4=Not Started,S=Noncompliance Identified Elsewhere,6=Previously Cited <br /> A. Administrative D. Backfilling&Grading H. Subsidence Control Plan <br /> 1. 1 Mining within Valid Permit 1. Exposed Openings <br /> 2. 1 Mining within Bonded Area 2._Contemporaneous Reclamation I. Roads <br /> 3. 1 Terms&Conditions of Permit P 1.-Road Construction <br /> _ 3.-Approximate Original Contour 2._Certification <br /> 4. 1 Liability Insurance 4._Highwall Elimination 3. Drainage <br /> 5. 1 Ownership and Control 5._SteepSlopes includes downslo e - g <br /> 6._Temporary Cessation p ( p ) 4.-Surfacing and Maintenance <br /> P rY 6. Handling of Acid&Toxic Materials 5. Reclamation <br /> 7._AML Rec.Fees--Non-Respondent 7,_Stabilization(rills and gullies) - <br /> 8._AML Rec.Fees--Failure to Pay E. Excess Spoil Disposal 1.J. Signs Si Markers <br /> B. Hydrologic Balance 1._Placement Signs <br /> 2. 5 Markers <br /> 1. 1 Drainage Control 2.- <br /> Drainage Control K. Distance Prohibitions <br /> 2. 1 Inspections&Certifications 3. Surface Stabilization _ <br /> L. Revegetation <br /> 3. 1 Siltation Structures 4._Inspections&Certifications 1. Vegetative Cover <br /> 4. 1 Discharge Structures F. Coal Mine Waste - <br /> 5. 1 Diversions (Refuse Piles/Impoundments) 2.-Tuning <br /> M <br /> 6. 1 Effluent Limits 1. Drainage Control M. -Postmining Land Use <br /> 7. 1 Ground Water Monitoring 2. Surface Stabilization N. Other <br /> 8. 1 Surface Water Monitoring 3._Placement General <br /> 9. 1 Drainage--Acid-Toxic Materials 4.- <br /> Inspections and Certifications Performance <br /> 10. 1 Impoundments 5. Impounding Structures Catagory <br /> 11. Stream Buffer Zones G. Use Of Explosives - 1) <br /> C. Topsoil& Subsoil 1.-Blaster Certification - <br /> 1._Removal 2.- <br /> Distance Prohibitions -2) <br /> 2. Substitute Materials 3.- <br /> Blast Survey/Schedule - <br /> 3. 1 Storage and Protection 4.-Warnings&Records -3) <br /> 4. Redistribution 5. Control of Adverse Effects - <br /> Performance Standard Catagories E. Excess Spoil Disposal...........................................(816/817.71-74) <br /> 30 CFR Counterpart 1. Placement..........................................................................................71(e) <br /> A. Administrative......................................................................... 2. Drainage Control................................................................................71(fl <br /> 1. Valid Permit....................................................................................773.11 3. Surface Stabilization...........................................................................71(g) <br /> 2. Mining within Bonded Area................................................773.11 4. Inspections&Certifications...............................................................71(h) <br /> 3. Terms&Conditions of Permit.............................................773.17 F. Coal Mine Waste(Refuse Piles/Impoundments) .....(816/817.81-84) <br /> 4. Liability Insurance................................................................800.60 <br /> 5. Ownership and Control....................................... .........778.13 1. Drainage Control...............................................................................83(a) <br /> 6. Temporary Cessation..............................842.11(e)&816/817.131 2. Surface Stabilization.......................................................................... <br /> 7. AML Rec.Fees--Non-Respondant................................870.15(b) 3. Placement...........................................................................................83(c) <br /> 8. AML Rec.Fees--Failure to Pay.....................................870.15(a) 4. Inspections and Certifications...........................................................83(d) <br /> B. Hydrologic Balance.....................................(816/817.41- 5. Impounding Structures...........................................................................84 <br /> 57) <br /> G. Use of Explosives..................................................(816/817.61-68) <br /> 1. Drainage Control.........................................................................45 <br /> 1. Blaster Certification...........................................................................61(c) <br /> 2. Inspections&Certifications.............................................49(a)(10) <br /> 3. Siltation Structures......................................................................46 2. Distance Prohibitions.........................................................................61(d) <br /> 4. Discharge Structures...................................................................47 3. Blast Survey/Schedule.......................................................................62-64 <br /> 5. Diversions...................................................................................43 4. Warnings&Records......................................................................66&68 <br /> 6. Effluent Limits............................................................................42 5. Control of Adverse Effects.....................................................................67 <br /> 7. Ground Water Monitoring......................................................41(c) H. Subsidence Control Plan.........................................(817.121-122) <br /> 8. Surface Water Monitoring......................................................41(e) I. Roads.................................................................(816/817.150-151) <br /> 9. Drainage--Acid-Toxic Materials...........................................41(f) <br /> 10. Impoundments........................................ .............49 1. Road Construction...........................................................................150(c) <br /> ....................... <br /> 11. Stream Buffer Zones...................... .....57 2. Certification......................................................................................151(a) <br /> 3. Drainage...............................................................................150( )-151(d) <br /> C. Topsoil&Subsoil...............................................(816/817.22) 4. Surfacing and Maintenance..................................................150(e)-151(d) <br /> 1. Removal..................................................................................22(a) 5. Reclamation......................................................................................150(f) <br /> 2. Substitute Materials.................................................................22(c) J. Signs&Markers......................................................(816/817.11) <br /> 3. Storage and Protection.............................................................22(c) <br /> 4. Redistribution..........................................................................22(d) 1. Signs.....................................................................................11(a),(b)>&(c) <br /> 2. Markers......................................................................11(a),(b),(d),(e),&(fl <br /> D. Backfilling&Grading..............................(816/817.95-107) K. Distance Prohibitions.......................................................(761.11) <br /> 1. Exposed Openings.....................816/817.13, 14, 15,&823.11 &21 L. Revegetation.....................................................(816/817.111-116) <br /> 2. Contemporaneous Reclamation..................................................100 <br /> 3. Approximate Original Contour..........................................102(a)(1) 1. Vegetative Cover.......................................................................111 &116 <br /> 4. Highwall Elimination.........................................................102(a)(2) 2. Timing..................................................................................................113 <br /> 5. Steep Slopes(includes downslope)............................................107 M. Postmining Land Use..............................................(816/817.133) <br /> 6. Handling of Acid&Toxic Materials......................................102(c) <br /> 7. Stabilization(rills and gullies)..................................................95(b) Revised December 4,1998 Page 2 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.