My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-16_PERMIT FILE - M2009082 (27)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009082
>
2009-10-16_PERMIT FILE - M2009082 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:14 PM
Creation date
10/20/2009 9:21:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009082
IBM Index Class Name
PERMIT FILE
Doc Date
10/16/2009
Doc Name
Stability Analysis
From
Lafarge West, Inc.
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inflow and Outflow Structures <br />In order to mine within 400 feet of the Cache la Poudre River, the Division of Reclamation Mining and <br />Safety (DRMS) requires the construction of engineered inflow and outflow structures. A single <br />inflow/outflow structure will be required for each of the following mining phases: 1C, 3, 4B, 4C, 5A, <br />5B, and 5C. Each inflow/outflow structure will be a native grass-lined trapezoidal channel excavated to <br />a depth of two feet with 4:1 (horizontal: vertical) side slopes. Because flow can be bi-directional, these <br />channels are to be constructed with no longitudinal slope. Each channel is approximately 200 feet in <br />length with the exception of the channel for Phase 4B which is approximately 300 feet in length. <br />The bottom width of the trapezoidal channel will vary from 20 to 100 feet depending on the size of the <br />phase. Phases 1C, 3, 5A, and 5C require a bottom width of 20 feet while Phases 4B and 5B require a <br />bottom width of 50 feet and Phase 4C requires a bottom width of 100 feet. The rate of inflow from the <br />river will vary as the river stage rises above the invert of the inflow/outflow structure based on HEC- <br />RAS modeling of the inflow/outflow structures. For the 200-ft channel with a bottom width of 20 feet, <br />the inflow would be 30 cfs, 60 cfs, and 120 cfs at river stages of 1.0 feet, 1.5 feet, and 2.0 feet above the <br />channel invert, respectively. The 200-ft channel with a bottom width of 50 feet would convey inflows <br />of 60 cfs, 140 cfs, and 270 cfs at similar stages of 1.0 feet, 1.5 feet, and 2.0 feet, respectively. For the <br />300-ft channel with a bottom width of 50 feet, these inflows would decrease slightly to 50 cfs, 120 cfs, <br />and 220 cfs at similar stages of 1.0 feet, 1.5 feet, and 2.0 feet, respectively. The inflow through the 200- <br />ft channel with a bottom width of 100 feet would be 120 cfs, 280 cfs, and 510 cfs at stages of 1.0 feet, <br />1.5 feet, and 2.0 feet respectively. <br />At these inflow rates, the cells will fill from the normal water line to the invert of the inflow/outflow <br />channel in approximately 5 to 14 hours at a river stage of 1.0 foot above the channel invert. Fill time <br />decreases to 3 to 6 hours with the stage at 1.5 feet above the channel invert and further decreases to 1 to <br />3 hours at 2.0 feet above the channel invert. Based on the 2003 floodplain study of the Cache la Poudre <br />River by the Corps of Engineers, these inflow/outflow channels will convey flood flows into the cells <br />more frequent that a 10-year event and possibly more frequent than a 5-year event. <br />Inflows to the mined cells will be conveyed through the grass-lined channels at non-erosive velocities <br />less than 5 feet per second. In the vicinity of the mined cell, higher velocities would be expected as the <br />inflow runs down the 4:1 side slope of the reclaimed cell. Slope protection such as a turf reinforcement <br />mat or an articulating concrete block revetment is recommended to protect the rundown portion of these <br />reclaimed slopes. Final design of this slope protection will be prepared prior to construction. <br />P10138 Lafarge\0138.013 Parsons Permit\DRMS Exhibds\Parsons Stabil¢y Exhib@.doc <br />Parsons Mine <br />DRMS 112 Permit <br />Page SE8 of SE8
The URL can be used to link to this page
Your browser does not support the video tag.