Laserfiche WebLink
block access, stockpile materials on or conduct mining operations on (1) the areas where the <br />residences and other.building are located on the Property, (2) the west Property boundary area <br />where the trees, fence, cattle trail and irrigation lateral are located, and (3) the north Property <br />boundary area where the Whitney Ditch i c t The Company will not remove the southern <br />fence without written permission from the17he Company shall conduct all mining related <br />operations within the State, County and Federal permit limits for the Property. <br />B. The Company shall have the right to construct, maintain, and use roads, <br />pipe lines, power lines, telephone lines, and stockpile areas and any right-of-way it deems <br />necessary or desirable for its operations on the Property related to the Company's operations <br />under this Lease. The Company shall have the right during the Term of this Lease and without <br />payment to Lessor (except for Production Royalties payable pursuant to Paragraph 3 and <br />Advance Minimum Royalties payable pursuant to Paragraph 4) to strip and remove overburden <br />and otherwise to use and occupy the Property as is reasonably required in connection with <br />mining, quarrying, extracting, processing, storage, transportation, sale and removal of Materials <br />from the Property on which the Company is conducting operations. <br />C. The Company shall consult with Lessor with respect to all permit <br />applications, plans and designs of the Company; provided, however, that all final decisions on <br />mine plans, operations, reclamation, permits and other plans of operations shall be in the <br />Company's sole discretion and control. <br />D. Lessor authorizes the Company on Lessor's behalf and agrees to cooperate <br />with the Company at no additional costs to the Lessor to apply for and obtain zoning or other <br />governmental land use classifications, permits, approvals, licenses, and rights (hereinafter <br />"authority") that are reasonably required in connection with the operations that are contemplated <br />under this Lease; provided, however, the Company shall provide bonds or other financial <br />assurance for its operations, including for the restoration, reclamation or rehabilitation of the <br />Property, as may be required or advisable to obtain such permits and approvals. <br />8. Conveyer Easement. In addition to the other rights granted under this Lease, <br />Lessor hereby grants to the Company an easement for the term of the Lease to erect, operate, <br />maintain, repair and relocate a conveyor system on, over and across the Property for the purpose <br />of conveying Materials across the Property to the Company's processing plant on the Etters <br />Property from any pit on the Property. Such easement shall include the right of vehicular access <br />for construction, installation, repair, operation, relocation and removal of the conveyor system. <br />9. Waiver of Lateral Support. With the exception of (a) the west Property boundary <br />area where the trees, fence, cattle trail and irrigation lateral are located, (b) the north Property <br />boundary where the Whitney Ditch is located, and (3) the areas of the Property where residences <br />are located, Lessor hereby waives the lateral support for mining purposes for the lands located <br />between the Property's boundary lines and the boundary lines for those adjacent properties that <br />are owned or leased by the Company, including but not limited to the Etters Property. <br />-5-