Laserfiche WebLink
Best Management Practices <br />The site is currently not operational. Once operations begin, appropriate BMPs will be installed <br />and outlined on this table. <br /> <br />PRACTICE EMPLOYED AREA WHERE PRACTICE IS <br />EMPLOYED DATE OF <br />IMPLEMENTATION <br />Vegetation Management: <br />Buffer Strips <br />Temporary Seeding <br />Constructed Wetlands <br />Revegetate as Practicable <br />Other (describe) <br />Water Management Tem ora Structural Controls : <br />Straw Bales <br />Silt Fences <br />Detention/Holding Ponds <br />Rip Rapping <br />Site Grading <br />Other (describe) <br />Water Management Permanent Structural Controls : <br />Upstream Flow Diversion <br />Channel Improvements <br />Flow Storage/Detention <br />Berming <br />Earth Dike <br />Check Dike <br />Check Dams <br />Pipe Slope Drain <br />Sediment Trap Area <br />Flow Attenuation Area <br />Infiltration Area <br />Secondary Containment for <br />Above-ground Storage Tanks <br />Washout Pits <br />Other (describe) <br />Other (describe) <br />Parsons Mine <br />Storm Water Management Plan <br />Page 9 of 19