Laserfiche WebLink
a pit run material, or it can be a combination of coarse and fine aggregates, with or <br />without mineral filler. The binder material used is normally asphalt cement but can also <br />be an asphalt emulsion or one of a variety of modified materials. Various additives, <br />including liquid and powdered materials, can also be incorporated into the mixture. <br />Activities at these sites may include the following: raw material unloading into <br />stockpiles or storage tanks, raw material feed to plant, material hatching, raw material <br />storage area, recyclable asphalt disposal area, truck wash out, and water supply and <br />settling lakes. <br />? READY MIXED CONCRETE, CENTRAL BATCHING <br />These operations mix sand, gravel, cement, and water together to form ready mix <br />concrete, which is then hauled to off-site construction projects. <br />The raw materials are made up of sand, gravel, cement, water and additives. The sand <br />and gravel is either stored in stockpiles located outside and fed into the plant via loaders <br />and conveyors, or it is stored directly in a series of hoppers located directly above the <br />central plant. The remainder of the raw materials is stored in tanks to protect them from <br />exposure to moisture and temperature until they are pumped into the mixer. Once the <br />raw materials are fed into the central mixer and combined to form Ready Mix concrete, <br />the final product is placed within trucks and removed from the site. <br />? READY MIXED CONCRETE, DRY BATCHING <br />These operations apportion out a mix of sand, gravel, cement, and water together, which <br />is then mixed within the truck to form Ready Mixed concrete that is hauled to off-site <br />construction projects. <br />The raw materials are made up of sand, gravel, cement, water and additives. The sand <br />and gravel is either stored in stockpiles located outside and fed into the plant via loaders <br />and conveyors, or it is stored directly in a series of hoppers located directly above the <br />central plant. The remainder of the raw materials is stored in tanks to protect them from <br />exposure to moisture and temperature until they are pumped into the mixer. Dry hatching <br />then apportions out and dumps the raw materials into the concrete truck-mounted mixer <br />where it is continually agitated and mixed to keep it from hardening before it arrives on <br />the assigned job site. <br />¦ EQUIPMENT FUELING <br />Diesel and/or gasoline tanks may be located on site for fueling of equipment, or <br />equipment may be wet-lined as needed. Off-site vendors refill tanks as needed. <br />? EQUIPMENT MAINTENANCE <br />The site contains a shop area where necessary maintenance can be conducted for site <br />equipment. Typical chemicals associated with maintenance, such as used oil, antifreeze, <br />motor oil, hydraulic oil, brake fluid, etc, may be stored on site as needed. All chemicals <br />are stored in such a manner as to prevent materials from mixing with stormwater or being <br />accidentally discharged off site or to waters of the U.S. <br />Parsons Mine <br />Storm Water Management Plan <br />Page 5 of 19