My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-16_PERMIT FILE - M2009082 (12)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009082
>
2009-10-16_PERMIT FILE - M2009082 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:13 PM
Creation date
10/20/2009 9:20:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009082
IBM Index Class Name
PERMIT FILE
Doc Date
10/16/2009
Doc Name
Stormwater Management Plan
From
Lafarge West, Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Identification of Discharge other than Stormwater <br />The site will be evaluated for the presence of non-Stormwater discharges. Water associated with <br />portable wash plants for processing aggregate and mine dewatering as necessary are the primary <br />sources of non-stormwater on site. Mine dewatering will be monitored as outlined above to <br />ensure no compliance with our permit restrictions. All other sources will be contained within the <br />site and are not discharged with stormwater. Water stored and applied on site for dust abatement <br />will be periodically utilized on the yard site and the access roads to suppress fugitive dust. <br />Applied dust control is not applied in excess amounts that would result in an off-site discharge of <br />liquids. Dust abatement is not necessary during precipitation events; therefore, no non-storm <br />water at the site is intermingled with storm water runoff. Water and other liquids utilized in <br />other peripheral uses and in the production of aggregate will be contained within the plant. Any <br />mechanical failure with the potential to allow a surfaces release would be addressed through the <br />site's spill response or emergency response protocols, free liquids would be isolated and <br />adsorbed, and adsorbents properly disposed. <br />Currently, no stormwater or commingled process water are in sufficient quantities to discharge <br />from the site. Should subsequent water uses be initiated on site, these water sources will be <br />identified in the table below: <br /> <br /> <br />Types of Discharge <br />No <br />Discharge Permitted <br />Process <br />Water <br /> <br />Unpermitted <br /> <br />Exempt <br /> <br />Control Measures <br />Mine Dewatering X <br />Equipment Wash Water X <br />Dust Control (roads) X <br />Irrigation return flows X <br />Other Agricultural discharge X <br />Fire Fighting discharges X <br />Foundation Draining(SUMP) X <br />Springs X <br />Other <br />Other <br />Parsons Mine <br />Storm Water Management Plan <br />Page 17 of 19
The URL can be used to link to this page
Your browser does not support the video tag.