Laserfiche WebLink
MAGGI ENGIIYEER`ING, INC. <br />820 South County Road 21 <br />'Berthoud, CO 80813 <br />October 11,, 2009 <br />Mi. Joe Doherty <br />Divide Constructors,,tne. <br />549 2°d Street <br />Berthoud, CO 80513 <br />Subject: Parsons Mine River and °Road:Crossings <br />Dear Joe???t{tilryr <br />s,. `7938 W.c <br />?j?29 a Q? <br />1 ?. <br />to <br />The requirements fb the?Poudre River and WCR:25 road crossi%s" llow;, <br />River Crossing Bridge <br />The long span required for the river crossing: will need to be a suspension bridge. <br />l) Towers will be approximately 40' tall` fabricated from 18" pipe.. The tower columns <br />will be 13' on center. <br />2) Tower foundations will be 36" diameter caissons drilledatleast 6' into shale. Thgy <br />will be topped with a grade beam; <br />3) Towers should be at least 30' back.from;the'river+ank. <br />4) Cable anchor blocks will be approximately. 125' from the tower center. They will <br />require approximately 100 yards of concrete. <br />5) Suspension cables will be 1 '/ The drop cables witt be I". <br />6) The conveyor structure will be a 36" truss with a'W mide walkway' on both.sides of <br />.the truss. <br />7) The lowest member of the structure over the river should. be'10' above.the; l 00-Year <br />flood IeveL <br />S) The river--bank will need to be: rip,-rapped 100' upstream and downstream from the <br />towers. <br />9) The structure will require wind>anchors. <br />--Continued on ?age 2