Laserfiche WebLink
r-, <br />L J <br />Surface <br />processing <br />facility <br />4.- -# --r-r-r - -- <br />Better water <br />0 <br />V <br />0 <br />0 <br />0 <br />heater-producer <br />well T-1 <br />(electrical cables <br />tomography <br />wells <br />- and fluid pipes in cemented <br />single well) casing to <br />surface heater <br />0 Nahcolitic oil shale <br />0- <br />0 <br />N <br />-30° incline <br />-------------------------------------- <br />Wasatch (no producible water) <br />0 <br />Figure 5-5. ,?'chri?nr?ic ATI .Sit'l1 cM0110 111, h1w <br />E <br />a? <br />a? <br />Cr <br />Q <br />%ISO's plan is to avoid aquifer impacts rather than to remediate contaminated aquifers. <br />The taructed RI test interval lies heluw the aquifers and is isolated tram the aquiti;rs by it <br />protective cap ofnahcolitic oil shale. NISO believes it can develop and commercialize <br />shale oil recoverv trom the Mite Minim-, Interval in a manner that avoids sioniticant <br />impact to the overhead naltcolitic oil shale. to the higher oil shale resource. and to the <br />aquifer resources <br />NISO \\ill design, construct. and operate retort tests within the mining interval in a <br />manner that protects all aquifers that may constitute an under41round serurcc ofdrinkin?l