Laserfiche WebLink
=?, <br />Hydro-Environmental Solutions, Inc. <br />hydrology, water quality and environmental consulting <br />October 14, 2009 <br />Ms. Janet Binns <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Hayden Gulch Loadout, Permit C-92-081 <br />Minor Revision No. 18 (MR-18) <br />Responses to Adequacy Comments <br />Dear Ms. Binns; <br />via: U.S. Postal Service <br /> <br />O'CT 6-L009 <br />Lii v. <br />__, nation, <br />u(IU Safety <br />Hayden Gulch Terminal, Inc. (HGTI) is in receipt of the Colorado Division of Reclamation, Mining <br />and Safety's (CDRMS) MR-18 Adequacy Letter dated October 13, 2009. HGTI has prepared the <br />attached package to address CDRMS's adequacy concerns. CDRMS's comments are presented below <br />in italics followed by HGTI's response. <br />1. On Page 3-2.6, Peabody Investments Corp, revised 09109, at the top of the page, Rick A. <br />Bowan is still listed as Senior Vice President. Please update the page to show that his <br />position of Senior Vice President was End Dated on 21112009. <br />Response: HGTI has updated the Peabody Investments Corporation listing (pages 3-2.5 and 3.2-6) to <br />show that Mr. Rick A. Bowan was end dated on 02/01/2009. Please insert the revised material in <br />accordance with the accompanying insertion instructions. <br />2. In AVS, L. Brent Stottlemyre, is listed as a Corporate Office with a memo title of "Chief <br />Accounting Officer (07125106) " with a start date of 7/19/2006 for Peabody Energy <br />Corporation. He is not listed on the revised pages submitted in the minor revision. Please <br />verb that L. Brent Stottlemyre is still actively holding this position or has been End Dated in <br />the position and then update revised pages 3-2.7 and 3-2.8 to add him to the list of officers <br />and directors so that both the revised pages and AVS will show the correct information. <br />Response: HGTI has updated the Peabody Energy Corporation listing (pages 3.2-7 and 3.2-8) to show <br />that Mr. L. Brent Stottlemyre is Chief Financial Officer, Controller and Senior Vice President with a <br />start date of 07/19/2006. Please insert the revised material in accordance with the accompanying <br />insertion instructions. <br />If you have any questions, please don't hesitate to contact the undersigned. <br />Sincerely, <br />Hydro-Environmental Solutions, Inc. <br />(on behalf.of Hayden Gulch Terminal, Inc.) <br />ohn Weinman <br />Project Manager <br />57 10th Street, Suite B <br />P.O. Box 772996 <br />Steamboat Springs, CO 80477 <br />970-846-5112