Laserfiche WebLink
Marcia Talvitie, P.E. -3- October 13, 2009 <br />BRL - Page 2.05-29 was amended to define the size of large rock. <br />7. DRMS - BRLLC commits to amending the soil, but does not mention a soil <br />sampling plan. This should be undertaken to determine what the in-place <br />material is comprised of. Soil sampling should include ph, EC (mmhos/cm), SAR, <br />texture and available water holding capacity. Soil amendments will be based <br />upon the results of soil material sampling using the guidance provided in the e- <br />mails from the NRCS. Please describe the soil sampling plan and proposed soil <br />analysis. <br />BRL - A soil sampling and soil analysis plan is presented on page 2.05-29. <br />8. DRMS - The numbering is off in the revised text. On Page 2.05-26, the "Mulching <br />Techniques" item is numbered (i). In order to be consistent with the preceding <br />pages, it should be numbered (iv). Likewise, the "Irrigation..." section should be <br />numbered (v), rather than (ii). On Page 2.05-27, "Measures..." should be <br />numbered (vi), and "Soil testing..." on Page 2.05-29 should be numbered (vii). <br />Please correct the outline numbering as described in the preceding paragraph. <br />BRL - The numbering has been corrected on the attached pages. <br />The following amended pages are enclosed: <br />Pages/Maps Discussion <br />Volume 7 <br />Table of Contents Amended Map table of contents. <br />Pgs 2.05-26 - 29i Amended reclamation plan for the cropland areas at the loadout <br /> facility <br />Exhibit 1 Add Pavka Spring No. 1 ownership documentation. <br />Exhibit 10 Emission permit cancellation letter dated September 5, 2008 <br />Exhibit 14 Add Right of Entry Letter for irrigated cropland reference area. <br />Map-15 New map showing location of irrigated cropland reference area <br />Please call if you have any questions. <br />Sincerely, <br />J. E. Stover, P.E. <br />Consulting Engineer <br />Cc: Denver Office (1 copy)