My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-15_REPORT - C1981010
>
Day Forward
>
Report
>
Coal
>
C1981010
>
2009-10-15_REPORT - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:12 PM
Creation date
10/15/2009 11:00:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Report
Doc Date
10/15/2009
Doc Name
3rd Quarter 2009 Review Letter
From
DRMS
To
Trapper Mining, Inc
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />o N D <br />D O L O <br />Denver, Colorado 80203 F <br />t <br />Phone: (303) 866-3567 RECLAMATION <br />FAX: (303) 832-8106 MINING <br /> <br /> SAFETY <br />October 15, 2009 <br /> Bill Ritter, Jr. <br />Seth Puls Governor <br />Inc <br />er Minin <br />Tra Harris D. Sherman <br />g, <br />pp <br />g, Executive Director <br />P.O. BOX 187 Ronald W. Cattany <br />CO 81626 <br />Craig Division Director <br />, Natural Resource Trustee <br />RE: Trapper Mining, Inc., Permit C-1981-010 <br />Third Quarter Horse Gulch Spoil Fill Inspection Report 2009 <br />Dear Mr. Puls, <br />The Colorado Division of Reclamation, Mining, and Safety (CDRMS) has reviewed and found the <br />above referenced report to be in compliance with the following CDRMS regulations: <br />4.09.1(11)(a) Inspected at least quarterly by a reregistered engineer or other qualified professional <br />specialist in construction of earth and rockfill embankments under the direction of a <br />qualified engineer throughout the construction <br />The certified report covers the third quarter monitoring period from June to August <br />2009 and the inspections were conducted by a certified engineer. <br />4.09.1(11)(b) Provide to the Division a certified report within 2 weeks after each inspection that the <br />fill has been constructed as specified in the design approved by the Division, The <br />report shall include a description of any appearances of instability, structural <br />weakness, and other hazardous conditions. <br />The inspection was conducted on September 30, 2009 and the report was received by <br />the Division on October 13, 2009. No instability, structural weakness, or other <br />hazardous conditions were noted during the September 30 inspection. <br />4.09. 1 (11) (c) Any certified report addressing the underdrain system and protective filters shall <br />include color photographs taken during and after construction, but before underdrain <br />are covered with excess spoil. If the underdrain system is constructed in phases, each <br />phase shall be certified separately. ...photographs shall be taken of the underdrain as <br />the underdrain system is being formed. The color photographs accompanying each <br />certified report shall be taken in adequate size and number with enough terrain or other <br />physical features of the site shown to provide a relative scale to the photographs and to <br />specifically and clearly identify the site. <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.