amen <br />Earth & Environmental <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the VLF Phase 5 Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial during the week. <br />V) VLF Geosynthetics <br />No work performed during the week. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed placement of structural fill within the Phase 5 VLF fill area. <br />AMEC observed and accepted subgrade preparation within the Phase 5 fill area. <br />AMEC observed construction of the new ADR water tank foundation. <br />AMEC observed exposure and removal of the old Phase IV solution lines. <br />Testing Summary <br />Laboratory testing continues (Particle Size Distribution, Atterberg Limits, and Moisture-Density <br />Compaction testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Structural fill placement within the Phase 5 VLF footprint will continue. <br />Resume processing soil liner fill at the South Cresson Clay Processing area. <br />Continue subgrade preparation within the Phase 5 VLF footprint. <br />Continue ADR waterline construction. <br />Continue removal of old Phase IV solution lines. <br />Summary of Non-conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V. <br />CC&V held a Weekly Construction meeting on September 22, 2009. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />VLF Weekly Report WE 09.26.09.D.doc