Laserfiche WebLink
M. COMMENTS-COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made during the <br /> inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br /> evidence supporting the enforcement action. <br /> Processing Waste <br /> The temporary coal waste pile area was inspected and found to be properly maintained. The clean <br /> water diversion ditch around the waste pile and sediment storage area is in good condition and clear of <br /> sediment. The berm around the waste pile is well maintained. The Division has received Minor <br /> Revision No. 47 for exporting coal waste from the temporary waste pile to Snowcap Coal Company's <br /> (SCC's) Roadside Mine CRDA-I. Disposal of refuse from McClane Canyon Mine was approved with <br /> MR-48 for the Roadside Mine in 2001. Page 13-23 of the Roadside Mine permit shows that SCC has <br /> approval to dispose of coal mine waste from the McClane Canyon Mine. <br /> Support Facilities <br /> The shop and facilities areas and office area were well kept. With exception of the shop area collection <br /> ditch noted above,perimeter areas at these locations were well maintained. <br />