My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-13_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2009-10-13_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:09 PM
Creation date
10/14/2009 9:47:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
REVISION
Doc Date
10/13/2009
Doc Name
Review Letter & Cost Estimate
From
DRMS
To
Coors Energy Company
Type & Sequence
SR1
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : <br />Material weight : 2,850 pounds/LCY <br />Material description <br />Sand - Damp <br />Rated payload : 75,000 pounds <br />Payload capacity : 26.32 LCY <br />Cycle Time : <br />Scraper loading time * : 1.00 minutes <br />Maneuver and spread time : 0.60 minutes <br />* load time per scraper pair on push-pull models <br />Travel time : <br />Road condition description :Firm, smooth, rolling <br />Haul Route : <br />icraper Bowl (volume) Basis : <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity: 26.32 LCY *'* <br />hourly production reflects volume per scraper pair on push-pull models <br /> Job Condition Corrections : Site altitude (ft.) : 5,000 <br /> Scraper Push dozer Source <br /> Altitude adj.: 1.000 NA (Cat HB) <br /> Job efficiency : 0.830 NA (Cat HB) <br />Net correction : 0.830 NA <br />dirtllt. surfaced, watered, maintained <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 1,400 1.00 3.00 4.00 2394 0.84 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 0.84 minutes <br />Return route : <br />** travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.61 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 3.05 minutes <br />Unadjusted unit production/hour : 1,035.22 LCY/hour *** Adjusted for job conditions : 859.24 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 859.24 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 1,718.47 LCY/hour <br /> <br />JOB TIME AND COST <br />Fleet size : 2 Team(s) Total job time : 93.79 Hours <br />Unit cost : $1.100 /LCY Total job cost : $177,269 <br />
The URL can be used to link to this page
Your browser does not support the video tag.